Biomass Boiler Replacement Motherwell

Biomass Boiler Replacement Motherwell

The works comprise the removal of the existing biomass boiler installation and the supply, installation and commissioning of a new fully operational Woodchip Biomass Boiler Plant System.

Biomass Boiler Replacement – Taylor High School, Motherwell

CONTRACT NOTICE – NATIONAL
WORKS

1 Authority Details

1.1

Authority Name and Address


North Lanarkshire Council

Chief Executive, Civic Centre, Windmillhill Street,

Motherwell

ML1 1AB

UK

Head of Business for Legal & Democratic Solutions

+44 1698302662

contract.support@northlan.gov.uk
http://www.northlanarkshire.gov.uk
http://www.publiccontractsscotland.gov.uk

1.2

Address from which documentation may be obtained


North Lanarkshire Council

Corporate Property & Procurement, Civic Centre, Windmillhill Street,

Motherwell

ML1 1AB

UK

Head of Corporate Property & Procurement

+44 1698302662

contract.support@northlan.gov.uk
http://www.northlanarkshire.gov.uk

1.3

Completed documents must be returned to:


North Lanarkshire Council

Chief Executive, Civic Centre, Windmillhill Street,

Motherwell

ML1 1AB

UK

Head of Business for Legal & Democratic Solutions

+44 1698302662

contract.support@northlan.gov.uk
http://www.northlanarkshire.gov.uk

2 Contract Details

2.1

Title

Biomass Boiler Replacement – Taylor High School, Motherwell

2.2

Description of the goods or services required

The works comprise the removal of the existing biomass boiler installation and the supply, installation and commissioning of a new fully operational Woodchip Biomass Boiler Plant System to replace the existing Biomass plant installation and connect into the existing heating generation system that comprises 3 gas fired boilers located in the main school plant room, in addition to the Biomass Boiler.

The fully operational and completed system shall comprise 500kW woodchip biomass boiler plant, flue, shunt pump/buffer loading pump, buffer/thermal storage vessel, heat meters, all associated controls and angle/fuel delivery system. The works will also comprise of all inter connections to the existing heating pipework and existing mechanical services control panel within the gas fired boiler plant room.

The works also comprise the stripping of the existing bitumen felt roof finish and full re-roofing of the building comprising the fuel store and biomass boiler room with new UPVC fascias etc. A new door access is to be formed into the fuel store with the formation of a viewing area and a new roof access hatch installed to replace the existing roof hatch for the fuel delivery.

The biomass boiler plant, buffer storage vessel etc will require to be brought into the biomass plant room through the roof with a suitable size access being formed for this to be carried out and then infilled for the new roof covering to be carried out.

NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at http://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=451668.

2.3

Notice Coding and Classification

391011 Buildings – Maintenance
399999 other Works – Construction, Repair and Maintenance

150 Glasgow & Strathclyde

2.4

Total quantity or scope of tender

This project is estimated at 200,000.00 GBP.

3 Conditions for Participation

3.1

Minimum standards and qualification required

As contained in in the First Stage Documentation and the Second Stage Documentation.

4 Administrative Information

4.1

Type of Procedure

Single stage – Any candidate may submit a tender.

4.2

Reference number attributed to the notice by the contracting authority

LLMS14210

4.3

Time Limits

Time-limit for receipt of completed tenders
28-07-2016  Time  12:00

Estimated award date
28-09-2016

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN

4.6

Tender Submission Postbox

5 Other Information

5.1

Additional Information

Please use the Tender Return Label provided to ensure the ITT reponse (First Stage Documentation and Second Stage Documentation) is returned to the correct office by Thursday 28th July 2016.

(SC Ref:451668)

5.2

Additional Documentation

Letter (Signed) – Single Stage
Tender Return Label (LLMS14210)
ITT (LLMS14210)

5.3

Publication date of this notice

28-06-2016

Express an interest online

 

Related Posts

Medway Council Combined Heat and Power Tender

Heating and Hot Water System Servicing Framework East Midlands

Planned and Preventative Maintenance Tender Nottingham

Heat Metering Framework

Enjoyed this post? Share it!