Building Work Care Homes Cardiff

Building Work Care Homes Cardiff

Procurement of Health related newbuild developments.

UK-Cardiff: construction work

2012/S 84-137773

Contract notice

Works

Directive 2004/18/EC

Section I: Contracting authority

I.1)Name, addresses and contact point(s)

Linc-Cymru Housing Association
387 Newport Road
For the attention of: Mr Brian Richards
CF24 1GG Cardiff
UNITED KINGDOM
Telephone: +44 2920474736
E-mail: brian.richards@linc-cymru.co.uk
Fax: +44 2920482474

Further information can be obtained from: The above mentioned contact point(s)

Tenders or requests to participate must be sent to: The above mentioned contact point(s)

I.2)Type of the contracting authority
Body governed by public law
I.3)Main activity
Health
Housing and community amenities
I.4)Contract award on behalf of other contracting authorities

Section II: Object of the contract

II.1)Description
II.1.1)Title attributed to the contract by the contracting authority:
Procurement of Health related newbuild developments.
II.1.2)Type of contract and location of works, place of delivery or of performance
Works
Execution
Main site or location of works, place of delivery or of performance: South Wales.
NUTS code UKL
II.1.3)Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
The notice involves the establishment of a framework agreement
II.1.4)Information on framework agreement
Framework agreement with several operators
maximum number of participants to the framework agreement envisaged: 6
Duration of the framework agreement

Duration in years: 4
Justification for a framework agreement, the duration of which exceeds four years: Not applicable.
Estimated total value of purchases for the entire duration of the framework agreement

Estimated value excluding VAT:
Range: between 0 and 0 GBP

II.1.5)Short description of the contract or purchase(s)
The framework agreement will be for one or more Care Homes, Extra Care Homes or other health related developments in South Wales. They will be newbuild developments of varying types and sizes. The procurement will be based on either design and build, partnering or traditional contracts.
Community Benefits do not apply to this contract.
II.1.6)Common procurement vocabulary (CPV)

45000000

II.1.7)Information about Government Procurement Agreement (GPA)
The contract is covered by the Government Procurement Agreement (GPA): no
II.1.8)Lots
This contract is divided into lots: no
II.1.9)Information about variants
II.2)Quantity or scope of the contract
II.2.1)Total quantity or scope:
To be established.
Estimated value excluding VAT:
Range: between 4 000 000 and 30 000 000 GBP
II.2.2)Information about options
II.2.3)Information about renewals
II.3)Duration of the contract or time limit for completion

Section III: Legal, economic, financial and technical information

III.1)Conditions relating to the contract
III.1.1)Deposits and guarantees required:
Performance bonds will be required. In addition the contracting authority reserves the right to request parent company and/or other guarantee of financial viability.
III.1.2)Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
As set out in the invitation to tender (ITT) documents.
III.1.3)Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
None specified, save that in the case of a partnership or consortium or other group of more than one legal entity bidding together, the contract will be either (1) all bidders on the basis of joint and several liabilty, or (2) with one or more of the parties acting as “prime contractor”(and where more than one, on a joint and several liability.
III.1.4)Other particular conditions
The performance of the contract is subject to particular conditions: no
III.2)Conditions for participation
III.2.1)Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers
Information and formalities necessary for evaluating if the requirements are met: Fulfils any of the criteria listed in Regulation 23 of the Public Contracts Regulations 2006 (as amended).
III.2.2)Economic and financial ability
Information and formalities necessary for evaluating if the requirements are met: (c) statement of turnover for a maximum of the last three years.
Minimum level(s) of standards possibly required: Not applicable.
III.2.3)Technical capacity
Information and formalities necessary for evaluating if the requirements are met:
(a) a list of works carried out over the last 5 years with certificates of satisfaction;
(c) an indication of technicians or technical bodies involved;
(d) a description of technical facilities and measures used to ensure quality;
(e) educational and professional qualifications of the supplier and staff responsible for performing the contract;
(f) where appropriate, an indication of the environmental management measures that would be applied when performing the contract;
(g) a statement of average annual manpower and number of staff in the last 3 years;
(i) details of any intended sub-contracting arrangements;
(j) where appropriate, samples, descriptions and photographs of products and quality assurance certificates.
III.2.4)Information about reserved contracts
III.3)Conditions specific to services contracts
III.3.1)Information about a particular profession
Execution of the service is reserved to a particular profession: no
III.3.2)Staff responsible for the execution of the service

Section IV: Procedure

IV.1)Type of procedure
IV.1.1)Type of procedure
Restricted
IV.1.2)Limitations on the number of operators who will be invited to tender or to participate
IV.1.3)Reduction of the number of operators during the negotiation or dialogue
IV.2)Award criteria
IV.2.1)Award criteria
The most economically advantageous tender in terms of the criteria stated in the specifications, in the invitation to tender or to negotiate or in the descriptive document
IV.2.2)Information about electronic auction
An electronic auction will be used: no
IV.3)Administrative information
IV.3.1)File reference number attributed by the contracting authority:
Not applicable
IV.3.2)Previous publication(s) concerning the same contract
IV.3.3)Conditions for obtaining specifications and additional documents or descriptive document
IV.3.4)Time limit for receipt of tenders or requests to participate
18.6.2012
IV.3.5)Date of dispatch of invitations to tender or to participate to selected candidates
16.7.2012
IV.3.6)Language(s) in which tenders or requests to participate may be drawn up
English.
IV.3.7)Minimum time frame during which the tenderer must maintain the tender
IV.3.8)Conditions for opening tenders

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.2)Information about European Union funds
The contract is related to a project and/or programme financed by European Union funds: no
VI.3)Additional information
All tender costs and liabilties incurred by bidders shall be the sole responsibility of bidders. The contracting authority reserves the right to annul the tendering process and not award any contract/s.
All documents to be priced in GBP and all payments made in GBP.
In relation to section II.1.9 above – variants will be accepted to the extent permitted in the tender documents (if at all).
Buy4Wales Reference Number: 30085.
VI.4)Procedures for appeal
VI.4.1)Body responsible for appeal procedures
VI.4.2)Lodging of appeals
Precise information on deadline(s) for lodging appeals: The Authority will allow a minimum of 10 calendar days standstill period between notifying the award decision and awarding the contract. Unsuccessful tenderers and applicants are entitled to receive reasons for the decision, including the characteristics and relative advantages of the winning bid and the reasons why the bid was unsuccessful. Should additional information be required it should be requested of the addressee in section 1.1.
VI.4.3)Service from which information about the lodging of appeals may be obtained

VI.5)Date of dispatch of this notice:26.4.2012