Demolition and Builderwork at Town House, Kirkcaldy

Demolition and Builderwork at Town House, Kirkcaldy

These works are part of an office refurbishment. These works will be carried out in conjunction with and concurrently with all other trades associated with the project, within the proposed and indicated time scales.

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Fife Council

Building Services Surveyors, 9 Hayfield Place, Hayfield Industrial Estate,

Kirkcaldy

KY2 5DJ

UK

Stacy Young

+44 8451555555-473226
http://www.fifedirect.org.uk

1.2

Address from which documentation may be obtained

As in 1.1

1.3

Completed documents must be returned to:

As in 1.1

2 Contract Details

2.1

Title

Demolition and Builderwork at Town House, Kirkcaldy

2.2

Description of the goods or services required

Demolition & Builderwork at Town House, Kirkcaldy

These works are part of an office refurbishment. These works will be carried out in conjunction with and concurrently with all other trades associated with the project, within the proposed and indicated time scales.

All contractors must visit site to fully acquaint yourself with the full extent of the nature of the works for all labour, material and plant to be included in your tender. Any additional costs will not be entertained for lack of such knowledge. Site visits will take place at 10.45am on Wednesday 22nd August lasting an hour and a half, for all tenderers interested in these works. Examples of previous demo contracts undertaken will be asked for before award of contract.

Any queries please call Nikki Leitch on 08451 555 555 Ext 477020.

All rubbish and waste materials must be removed from site by the successful tenderer, and included in the rates.

NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at http://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=236362.

The awarding authority has indicated that it will accept electronic responses to this notice via a ‘Tender Submission Postbox’ facility. Further details of this facility are available at http://www.publiccontractsscotland.gov.uk/PostBox/Postbox_Explain.aspx?ID=236362.

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems. The postbox closes precisely at the time stated.

2.3

Notice Coding and Classification

391000 Buildings
391010 Buildings – Construction
391011 Buildings – Maintenance
391013 Buildings – Outsourced
391213 Engineering
399999 other Works – Construction, Repair and Maintenance

140 … Tayside, Central & Fife

2.4

Total quantity or scope of tender

Schedule provided, however all works noted on drawings under this package must be included for.

3 Conditions for Participation

3.1

Minimum standards and qualification required

The completion, in full, and the electronic return of all requested documents. Compliance with all documentation, specifications and drawings.

4 Administrative Information

4.1

Type of Procedure

Single stage – Any candidate may submit a tender.

4.2

Reference number attributed to the notice by the contracting authority

CU 366/12

4.3

Time Limits

a) Time-limit for obtaining documentation

b) Time-limit for receipt of completed tenders
31-08-2012  Time  12:00

c) Estimated award date  07-09-2012

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

The awarding authority has indicated that it will accept electronic responses to this notice via the Tender Submission Postbox facility. Further details are available at http://www.publiccontractsscotland.gov.uk/PostBox/Postbox_Explain.aspx?ID=236362

5 Other Information

5.1

Additional Information

Please ensure you attend site visit at 10.45am on Wednesday 22nd August.

(SC Ref:236362)

5.2

Additional Documentation

00-A(22)001
00-A(70)010
00-A(70)011
00-A(70)012
00-A(70)013
00-L(40)001
00-L(GA)010 – Basement Proposed
00-L(GA)020 – GF Proposed
00-L(GA)021 – GF Proposed
00-L(GA)022 – GF Proposed
01-L(GA)001 – Basement Existing
00-L(GA)023 – GF Proposed
01-L(GA)002 – Existing Plans
01-L(GA)011 – GF Proposed
01-L(GA)030 – GF Proposed
01-L(GA)031 – GF Proposed
01-L(GA)032 – GF Proposed
01-L(GA)033 – GF Proposed
02-L(GA)003 – FF Existing
02-L(GA)012 – Proposed
02-L(GA)040 – FF Proposed
02-L(GA)041 – FF Proposed
02-L(GA)042 – FF Proposed
02-L(GA)043 – FF Proposed
03-L(GA)004 – SF Existing
03-L(GA)050 – SF Proposed
03-L(GA)051 – SF Proposed
03-L(GA)052 – SF Proposed
03-L(GA)053 – SF Proposed
Typical Corridor Perspective
01-A(24)001
01-A(24)002
01-L(35)001
01-L(40)002
01-L(70)001
01-L(74)001
02-L(35)002
02-L(70)002
02-L(74)002
03-L(35)003
03-L(40)004
03-L(70)003
03-L(74)003
03-L(GA)004
03-L(GA)013
XX-A(32)001
XX-A(32)002
XX-A(32)003
xx-A(32)004
xx-A(32)005
XX-A(32)006
XX-DS(35)010
XX-L(74)004
Demolition & Builderwork
01-L(40)002
02-L(40)003
00-XX(SPEC)001 – Spec Document
Town House Drawing Register
Demolition & Builderwork Doc
1st & 2nd Floors A3 Asbestos Plan
Asbestos Register
Babcock Asbestos Survey
Basement & Ground Floors Asbestos Plan

5.3

Publication date of this notice

14-08-2012

 

Enjoyed this post? Share it!