Design and Construction of Footbridge – London

Design and Construction of Footbridge – London

This contract is for the design, construction and installation of a timber footbridge across the watercourse within the location indicated in Appendix A of the specification. 

Harrow Council
Lakegrove Park – Construction of Footbridge
None
Lakegrove Park – Construction of Footbridge

 

This contract is for the design, construction and installation of a timber footbridge across the watercourse within the location indicated in Appendix A of the specification. The exact location will be agreed with the Harrow council Project Engineer prior to commencement of works.

 

The works are also to include the design and construction of the bridge foundations.

 

The proposed construction works are to be undertaken between 1 July and 31 August 2014

 

All design work to be undertaken by Chartered Civil and Structural Engineers experienced in bridge work design.

Contact:
Ms Jessica Covey
Email Address:
Jessica.Covey@harrow.gov.uk
Telephone:
Please email
Key Dates
01/07/2014
01/07/2015
13/05/2014 10:35
03/06/2014 12:00
Other Information
12 (months)
0 (months)
0

Express an interest online

Enjoyed this post? Share it!