Reactive Measured Term Facilities and Building Maintenance for Merseytravel

Reactive Measured Term Facilities and Building Maintenance for Merseytravel

Merseyside Passenger Transport Executive (Trading as Merseytravel) is seeking expressions of interest from suitable contractors to enter into a Measured Term Contract for Planned and Reactive Facilities and Building Maintenance for a three year period, with a potential extension period of up to 2 years.

Merseytravel
Provision of Reactive Measured Term Facilities and Building Maintenance
None
Merseyside Passenger Transport Executive (Trading as Merseytravel) is seeking expressions of interest from suitable contractors to enter into a Measured Term Contract for Planned and Reactive Facilities and Building Maintenance for a three year period, with a potential extension period of up to 2 years.
The initial levels of work (e.g. Year.1) are based upon previous levels of maintenance that were required across the estate, but as the various areas of the organisation are brought into the new headquarters building coupled with the renewal of various plant/systems, It is foreseen that there will be a reduced need for those original levels of maintenance, thus the reduction of contract values in years 2 & 3.
The Sites
The contract covers a broad array of Merseytravel’s sites across the County of Merseyside. The greater part of the works will be based in Merseytravel’s Bus stations and Travel Centres. However, the successful contractor will also be expected to carry out maintenance works at other building types which will include offices, workshops, control rooms, storage areas as well as buildings within the Mersey Tunnels and Mersey Ferries sections of the estate.

The Works
The ‘Planned Maintenance’ works element of the contract will include, but will not be limited to, legionella testing, PAT testing, emergency lighting, electrical testing and inspection, LOLER testing (High mast lighting, Lifting equipment etc.),  automatic and manual gates inspections, interceptor inspections, guttering and drainage inspections.
The ‘Reactive Maintenance’ works element of the contract will include, but will not be limited to, reactive maintenance of windows, doors, stairs, surface finishes (e.g. Graffiti removal), rainwater systems, drainage, masonry, hard standings, roofing, plumbing, electrical faults, access control, street furniture and vandalism.

Contact:
M General Support
Email Address:
tender@merseytravel.gov.uk
Telephone:
00 – Questions via portal please
Address:
No.1 Mann Island
Liverpool
Merseyside
L3 1BP
United Kingdom
Key Dates
30/05/2013
29/05/2017
24/01/2013 11:40
07/02/2013 12:00
Other Information
36 (months)
24 (months)
0

Enjoyed this post? Share it!