River Ness Flood Alleviation Scheme Ph I – Utility Diversions
River Ness Flood Alleviation Scheme Ph I – Utility Diversions
Coordination and execution of utility diversions and highway modifications in order to facilitate construction of the River Ness Flood Alleviation Scheme Phase I, including BT, Cable & Wireless, Scottish Water, Scottish Gas Networks, SSE & Associated Enabling Works. Please refer to Utilities Diversion Details – Additional Ducument.
CONTRACT NOTICE – NATIONAL
| WORKS | |||||||||||||||||||||||||||||||||||||||||||||
1 Authority Details |
|||||||||||||||||||||||||||||||||||||||||||||
1.1 |
Authority Name and Address |
||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||
1.2 |
Address from which documentation may be obtained
|
||||||||||||||||||||||||||||||||||||||||||||
1.3 |
Completed documents must be returned to:
|
||||||||||||||||||||||||||||||||||||||||||||
2 Contract Details |
|||||||||||||||||||||||||||||||||||||||||||||
2.1 |
TitleRiver Ness Flood Alleviation Scheme Ph I – Utility Diversions |
||||||||||||||||||||||||||||||||||||||||||||
2.2 |
Description of the goods or services requiredCoordination and execution of utility diversions and highway modifications in order to facilitate construction of the River Ness Flood Alleviation Scheme Phase I, including BT, Cable & Wireless, Scottish Water, Scottish Gas Networks, SSE & Associated Enabling Works. Please refer to Utilities Diversion Details – Additional Ducument.
NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at http://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=230133. |
||||||||||||||||||||||||||||||||||||||||||||
2.3 |
Notice Coding and Classification
|
||||||||||||||||||||||||||||||||||||||||||||
2.4 |
Total quantity or scope of tenderThe estimated value of the Works is GBP 800k |
||||||||||||||||||||||||||||||||||||||||||||
3 Conditions for Participation |
|||||||||||||||||||||||||||||||||||||||||||||
3.1 |
Minimum standards and qualification requiredCompanies wishing to express interest who are not already prequalified with TEC Services for Works of this nature, should complete and return the PQQ as instructed. ALL companies expressing interest MUST also submit the ‘Details of Works Experience’ form & return to Tracy Clarke by email before noon 29th June 2012. Failure to do so will result in exclusion from the Select List of Applicants – both forms are attached as Additional Documentation to this advertisement. The restricted number of companies (normally between 5 and 8) will then be invited to tender on the basis of PQQ score, Tender History, Performance History, proven recent experience of works of this nature, capability and financial factors – in accordance with the Scoring Matrix as attached as Additional Documentation. The form of Contract will be the NEC3 Option A and applicants are expected to have experience with the NEC ECC forms of contract. Tenders Award will be based on lowest tender assessment price. |
||||||||||||||||||||||||||||||||||||||||||||
4 Administrative Information |
|||||||||||||||||||||||||||||||||||||||||||||
4.1 |
Type of ProcedureDual stage – Candidates must first pass a selection procedure before being invited to tender or negotiate. |
||||||||||||||||||||||||||||||||||||||||||||
4.2 |
Reference number attributed to the notice by the contracting authorityHAC5007 |
||||||||||||||||||||||||||||||||||||||||||||
4.3 |
Time Limits |
||||||||||||||||||||||||||||||||||||||||||||
29-06-2012 Time 12:00 c) Estimated award date 06-08-2012 |
|||||||||||||||||||||||||||||||||||||||||||||
4.5 |
Language or languages in which tenders or requests to participate can be drawn upEN |
||||||||||||||||||||||||||||||||||||||||||||
4.6 |
Tender Submission Postbox |
||||||||||||||||||||||||||||||||||||||||||||
5 Other Information |
|||||||||||||||||||||||||||||||||||||||||||||
5.1 |
Additional InformationThe Works are anticipated to commence in September 2012 (SC Ref:230133) |
||||||||||||||||||||||||||||||||||||||||||||
5.2 |
Additional Documentation
|
||||||||||||||||||||||||||||||||||||||||||||
5.3 |
Publication date of this notice08-06-2012 |
||||||||||||||||||||||||||||||||||||||||||||