Expressions of interest are invited from suitably experienced organisations capable of undertaking a contract for the detailed design and subsequent construction of a 10km dual carriageway running from the A6 at Hazel Grove to the Ringway Road / Ringway Road West junction, incorporating an existing section of the A555.
Stockport Metropolitan Borough Council
A6 to Manchester Airport Relief Road
None
Expressions of interest are invited from suitably experienced organisations capable of undertaking a contract for the detailed design and subsequent construction of a 10km dual carriageway running from the A6 at Hazel Grove to the Ringway Road / Ringway Road West junction, incorporating an existing section of the A555.
 
The scope of the work shall comprise, but will not be limited to, the completion of the detailed design, construction and defects liability maintenance of approximately 10km of dual carriageway running from A6 at Hazel Grove to the Ringway Road / Ringway Road West junction, incorporating an existing section of the A555.
 
Scope includes: construction of and work to railway / road / cycle and pedestrian bridges; traffic signal installations; road lighting; culverts; utility diversions and landscaping works.
 
The project will be procured under an Early Contractor Involvement (ECI) arrangement with an anticipated commencement date of 09/08/2013 and will be awarded under an NEC Engineering and Construction Contract. The project will involve a staged ECI process and has a scheduled start date for the construction works of 28/10/2014 with expected completion of works by 26/05/2017.
 
It should be noted that expressing an interest in response to this Notice does not place any supplier in an advantageous position.
 
Expressions of interest can be obtained from The Chest. Suppliers should first register at < SPAN style=”mso-bidi-font-family: Arial”>https://www.the-chest.org.uk/procontract/supplier.nsf/frm_home?openFor m.
Expressions of interest are invited from suitably experienced organisations capable of undertaking a contract for the detailed design and subsequent construction of a 10km dual carriageway running from the A6 at Hazel Grove to the Ringway Road / Ringway Road West junction, incorporating an existing section of the A555.
 
The scope of the work shall comprise, but will not be limited to, the completion of the detailed design, construction and defects liability maintenance of approximately 10km of dual carriageway running from A6 at Hazel Grove to the Ringway Road / Ringway Road West junction, incorporating an existing section of the A555.
 
Scope includes: construction of and work to railway / road / cycle and pedestrian bridges; traffic signal installations; road lighting; culverts; utility diversions and landscaping works.
 
The project will be procured under an Early Contractor Involvement (ECI) arrangement with an anticipated commencement date of 09/08/2013 and will be awarded under an NEC Engineering and Construction Contract. The project will involve a staged ECI process and has a scheduled start date for the construction works of 28/10/2014 with expected completion of works by 26/05/2017.
 
It should be noted that expressing an interest in response to this Notice does not place any supplier in an advantageous position.
 
Expressions of interest can be obtained from The Chest. Suppliers should first register at < SPAN style=”mso-bidi-font-family: Arial”>https://www.the-chest.org.uk/procontract/supplier.nsf/frm_home?openFor m.

??Ä.t 

Contact:
Miss Clare Wild
Email Address:
clare.wild@stockport.gov.uk
Telephone:
0161 474 4103
Address:
Corporate Procurement
2nd Floor Stopford House
Stockport
Greater Manchester
SK1 3XE
United Kingdom
Key Dates
12/08/2013
26/05/2017
25/10/2012 00:00
14/12/2012 00:00
Other Information
45 (months)
0 (months)
0