Back Lane Eckington – Bridleway 119 surface improvements

Back Lane Eckington – Bridleway 119 surface improvementsRe-construction of existing un-metalled bridleway over a length of 1km using granular sub base overlaid with 100% recycled surfacing material.
Construction of 200m of new build un-metalled footpath/cycle way and erection of gates and stiles. Vegetation trimming and clearance.http://www.sourcederbyshire.co.uk/contracts/show/id/6329