Biomass Boiler Replacement Motherwell
The works comprise the removal of the existing biomass boiler installation and the supply, installation and commissioning of a new fully operational Woodchip Biomass Boiler Plant System.
Biomass Boiler Replacement – Taylor High School, Motherwell
CONTRACT NOTICE – NATIONAL | |||||||||||||||||||||
WORKS | |||||||||||||||||||||
1 Authority Details |
|||||||||||||||||||||
1.1 |
Authority Name and Address |
||||||||||||||||||||
|
|||||||||||||||||||||
1.2 |
Address from which documentation may be obtained
|
||||||||||||||||||||
1.3 |
Completed documents must be returned to:
|
||||||||||||||||||||
2 Contract Details |
|||||||||||||||||||||
2.1 |
TitleBiomass Boiler Replacement – Taylor High School, Motherwell |
||||||||||||||||||||
2.2 |
Description of the goods or services requiredThe works comprise the removal of the existing biomass boiler installation and the supply, installation and commissioning of a new fully operational Woodchip Biomass Boiler Plant System to replace the existing Biomass plant installation and connect into the existing heating generation system that comprises 3 gas fired boilers located in the main school plant room, in addition to the Biomass Boiler. – The fully operational and completed system shall comprise 500kW woodchip biomass boiler plant, flue, shunt pump/buffer loading pump, buffer/thermal storage vessel, heat meters, all associated controls and angle/fuel delivery system. The works will also comprise of all inter connections to the existing heating pipework and existing mechanical services control panel within the gas fired boiler plant room. – The works also comprise the stripping of the existing bitumen felt roof finish and full re-roofing of the building comprising the fuel store and biomass boiler room with new UPVC fascias etc. A new door access is to be formed into the fuel store with the formation of a viewing area and a new roof access hatch installed to replace the existing roof hatch for the fuel delivery. – The biomass boiler plant, buffer storage vessel etc will require to be brought into the biomass plant room through the roof with a suitable size access being formed for this to be carried out and then infilled for the new roof covering to be carried out. NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at http://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=451668. |
||||||||||||||||||||
2.3 |
Notice Coding and Classification
|
||||||||||||||||||||
2.4 |
Total quantity or scope of tenderThis project is estimated at 200,000.00 GBP. |
||||||||||||||||||||
3 Conditions for Participation |
|||||||||||||||||||||
3.1 |
Minimum standards and qualification requiredAs contained in in the First Stage Documentation and the Second Stage Documentation. |
||||||||||||||||||||
4 Administrative Information |
|||||||||||||||||||||
4.1 |
Type of ProcedureSingle stage – Any candidate may submit a tender. |
||||||||||||||||||||
4.2 |
Reference number attributed to the notice by the contracting authorityLLMS14210 |
||||||||||||||||||||
4.3 |
Time LimitsTime-limit for receipt of completed tenders Estimated award date |
||||||||||||||||||||
4.5 |
Language or languages in which tenders or requests to participate can be drawn upEN |
||||||||||||||||||||
4.6 |
Tender Submission Postbox |
||||||||||||||||||||
5 Other Information |
|||||||||||||||||||||
5.1 |
Additional InformationPlease use the Tender Return Label provided to ensure the ITT reponse (First Stage Documentation and Second Stage Documentation) is returned to the correct office by Thursday 28th July 2016. (SC Ref:451668) |
||||||||||||||||||||
5.2 |
Additional Documentation
|
||||||||||||||||||||
5.3 |
Publication date of this notice28-06-2016 |
Related Posts
Medway Council Combined Heat and Power Tender
Heating and Hot Water System Servicing Framework East Midlands
Planned and Preventative Maintenance Tender Nottingham