Construction Work – St Mary’s Airport Terminal Project
The project will also focus on the provisions for airport staff including new and relocated check-in desks, an increase in the number of administration offices for carriers with dedicated kitchen area, new baggage weigh-in and tagging systems, new baggage conveyor, future space allowance for X ray of baggage and new locker rooms and associated welfare facilities.
United Kingdom-Hugh Town: Construction work
2013/S 175-301442
Contract notice
Works
Directive 2004/18/EC
Section I: Contracting authority
Council of the Isles of Scilly
Council of the Isles of Scilly, Town Hall, Hugh Town, ST Mary’s Isles of Scilly
For the attention of: Sean Parsons
TR210LW Hugh Town
UNITED KINGDOM
Telephone: +44 1720424801
E-mail: iosterminalproject@scilly.gov.uk
Fax: +44 1720424017
Internet address(es):
General address of the contracting authority: http://www.scilly.gov.uk
Electronic access to information: http://www.scilly.gov.uk/procurement/contractop.htm
Further information can be obtained from: The above mentioned contact point(s)
Specifications and additional documents (including documents for competitive dialogue and a dynamic purchasing system) can be obtained from: The above mentioned contact point(s)
Tenders or requests to participate must be sent to: The above mentioned contact point(s)
Section II: Object of the contract
Execution
Main site or location of works, place of delivery or of performance: St Mary’s Airport, St Mary’s, Isles of Scilly, TR21 0NG.
NUTS code
This will include providing an improved passenger experience through upgrading of the departures and arrivals areas through a new facade extension, improved check In and queuing area, improved customer information monitors, better seating, draught-proofing, refurbished cafe area and relocated cafe kitchen, better natural and artificial lighting, refurbished passenger WC’s, complete redecoration, replacement of the windows and Improving thermal performance (roof insulation).
The project will also focus on the provisions for airport staff including new and relocated check-in desks, an increase in the number of administration offices for carriers with dedicated kitchen area, new baggage weigh-in and tagging systems, new baggage conveyor, future space allowance for X ray of baggage and new locker rooms and associated welfare facilities.
Improvements are also required to the “airside” elements of the terminal including an enlarged and reconfigured baggage handling and FF&R ancillary spaces, better space for handling of freight/packages, reconfigured belt, space for five baggage tugs with trailers for overnight storage, undercover loading, new crew room with kitchenette area, eating, seating area, new staff toilets and shower room, ready room for ATC staff, refurbishment/upgrading of existing control desks and associated instrumentation/hardware to the ATC Tower and improved sun-screening/shading to windows of ATC Tower room.
Externally, the works will include an external walled ‘garden’ area, rationalisation of the external spaces including parking, landscaping, signage, pick-up and drop-off zones and new external storage and the provision of a canopy to inbound arrivals and outbound departures areas.
Additionally, the project will seek to include solar photovoltaic panels for the generation of electricity for the terminal building.
45000000, 45213000, 45213300, 45213330, 45213331, 45213333, 45213400
Range: between 2 000 000 and 2 300 000 GBP
Section III: Legal, economic, financial and technical information
Minimum level(s) of standards possibly required: Annual turnover of at least £2mil per annum in the last 2 years.
The technical capacity of the organization will be assessed using the scoring criteria set out in the Pre-qualification questionaire at section 2.
Section IV: Procedure
Objective criteria for choosing the limited number of candidates: The criteria for the selection of operators is set out in the Pre-qualification Questionaire for the project and is in accordance with Regulations 23, 24, 25 and 26 of the Public Contracts Regulations 2006.
Section VI: Complementary information
Reference to project(s) and/or programme(s): The Isles of Scilly Airport Project of which the St Mary’s Terminal Project forms a part is part funded by the European Regional Development Fund through the Cornwall and the Isles of Scilly Convergence Programme.
VI.5)Date of dispatch of this notice:6.9.2013