Immingham Renewable Fuels Terminal

Immingham Renewable Fuels Terminal

Immingham Renewable Fuels Terminal (IRFT) – Humber International Terminal – dry bulk materials discharge, handling, storage and rail loadout facilities. Associated British Ports.

UK-Grimsby: construction work

2012/S 120-199670

Contract notice – utilities

Works

Directive 2004/17/EC

Section I: Contracting entity

I.1)Name, addresses and contact point(s)

Associated British Ports
Port Office Cleethorpe Road
Contact point(s): Terry Bird
For the attention of: Terry Bird
DN31 3LL Grimsby
UNITED KINGDOM
Telephone: +44 1472359181
E-mail: tbird@abports.co.uk

Internet address(es):

General address of the contracting entity: http://www.abports.co.uk

Further information can be obtained from: The above mentioned contact point(s)

Specifications and additional documents (including documents for a dynamic purchasing system) can be obtained from: The above mentioned contact point(s)

Tenders or requests to participate must be sent to: The above mentioned contact point(s)

I.2)Main activity

Port-related activities
I.3)Contract award on behalf of other contracting entities

The contracting entity is purchasing on behalf of other contracting entities: no

Section II: Object of the contract

II.1)Description
II.1.1)Title attributed to the contract by the contracting entity:

Immingham Renewable Fuels Terminal (IRFT) – Humber International Terminal – dry bulk materials discharge, handling, storage and rail loadout facilities.
II.1.2)Type of contract and location of works, place of delivery or of performance

Works
Design and execution
Main site or location of works, place of delivery or of performance: Humber International Terminal, Port of Immingham.
NUTS code UKE13

II.1.3)Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
II.1.4)Information on framework agreement
II.1.5)Short description of the contract or purchase(s):

The works comprise the design and construction of a dry bulk materials discharge, handling, storage and rail loadout facility to enable the discharge of dry bulk material from vessels, onto a conveyor system into automated storage facilities and onward transportation by conveyor through to a rail loadout facility.
II.1.6)Common procurement vocabulary (CPV)

45000000

II.1.7)Information about Government Procurement Agreement (GPA)

The contract is covered by the Government Procurement Agreement (GPA): no
II.1.8)Information about lots

This contract is divided into lots: no
II.1.9)Information about variants

Variants will be accepted: no
II.2)Quantity or scope of the contract
II.2.1)Total quantity or scope:

The works comprise the design and construction of a dry bulk handling facility and shall include the procurement of vessel discharge equipment in the form of continuous ship unloader(s) capable of discharging panamax vessels for onward transportation via conveyor systems into an automated storage facility capable of storing up to 100 000 tonnes of dry bulk products on a first in first out basis and the onward transportation via conveyor system into a rail loadout facility for onward transportation by train.
II.2.2)Information about options

Options: no
II.2.3)Information about renewals

This contract is subject to renewal: no
II.3)Duration of the contract or time limit for completion

Starting 10.12.2012 Completion 1.5.2014

Section III: Legal, economic, financial and technical information

III.1)Conditions relating to the contract
III.1.1)Deposits and guarantees required:

No deposit is required with requests to participate. Details of guarantees, design warranties and Parent Company Guarantees required under the Terms of the Contract will be advised in the Tender Document or at the pre-selection stage. (A 10 % Guarantee Bond shall be required from the successful bidder following award of the Contract).
III.1.2)Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:

The purchase is to be wholly financed by Associated British Ports. Provision for payment, retention and liquidated damages will accord with those provisions within the prescribed Conditions of Contract.
III.1.3)Legal form to be taken by the group of economic operators to whom the contract is to be awarded:

FIDIC – Conditions of Contract for Plant and Design Build for Electrical and Mechanical Plant, and for Building and Engineering Works, Designed by the Contractor – First Edition 1999.
III.1.4)Other particular conditions:

The performance of the contract is subject to particular conditions: yes
Description of particular conditions: ABP’s Particular Conditions of Contract.
III.2)Conditions for participation
III.2.1)Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers

Information and formalities necessary for evaluating if the requirements are met: The applicant must demonsrate their previous experience and technical ability to the design and construction of similar facilities.
Their financial history and current financial position must be strong and the applicant must accept the Contract proposed in Section III.1.3.
III.2.2)Economic and financial ability

Information and formalities necessary for evaluating if the requirements are met: a) Statement and references from the firms bankers.
b) A statement of the firms overall turnover for schemes of this type for the 5 previous financial years.
c) The firms balance sheet and Profit and Loss account for the 3 previous financial years.
d) The firms Company registration number and details.
III.2.3)Technical capacity

Information and formalities necessary for evaluating if the requirements are met: a) The applicant must provide precise details of similar project(s) satisfactorily undertaken over the last 5 years, including value and client. Details must make clear the scope of the works and the degree of responsibility undertaken by the applicants.
b) Statements of the firms organisational structure and details of the qualifications and experience of key management and technical personnel to be employed on the project.
c) The applicant must provide copies of all policy and procedural documentation demonstrating their management and implementationof all Health, Safety and Environmental legislative requirements.
d) The applicant must provide Health and Safety statistics including notices served against the Company and accident statistics over the last 3 years.
III.2.4)Information about reserved contracts
III.3)Conditions specific to services contracts
III.3.1)Information about a particular profession

Execution of the service is reserved to a particular profession: no
III.3.2)Staff responsible for the execution of the service

Legal persons should indicate the names and professional qualifications of the staff responsible for the execution of the service: no

Section IV: Procedure

IV.1)Type of procedure
IV.1.1)Type of procedure

Restricted
IV.2)Award criteria
IV.2.1)Award criteria

The most economically advantageous tender in terms of the criteria stated below

1. Health and Safety. Weighting 5

2. Price. Weighting 30

3. Organisation Management. Weighting 5

4. Technical Ability and Previous Experience. Weighting 30

5. Programme. Weighting 10

6. General Overview. Weighting 20

IV.2.2)Information about electronic auction

An electronic auction will be used: no
IV.3)Administrative information
IV.3.1)File reference number attributed by the contracting entity:

1038/100
IV.3.2)Previous publication(s) concerning the same contract

no
IV.3.3)Conditions for obtaining specifications and additional documents

Payable documents: no
IV.3.4)Time limit for receipt of tenders or requests to participate

27.7.2012
IV.3.5)Language(s) in which tenders or requests to participate may be drawn up

English.
IV.3.6)Minimum time frame during which the tenderer must maintain the tender
IV.3.7)Conditions for opening tenders

Section VI: Complementary information

VI.1)Information about recurrence

This is a recurrent procurement: no
VI.2)Information about European Union funds

The contract is related to a project and/or programme financed by European Union funds: no
VI.3)Additional information:
VI.4)Procedures for appeal
VI.4.1)Body responsible for appeal procedures
VI.4.2)Lodging of appeals
VI.4.3)Service from which information about the lodging of appeals may be obtained
VI.5)Date of dispatch of this notice:

21.6.2012