Keswick Information Centre Redesign

Keswick Information Centre Redesign

LDNPA require a professional shop-fitter or similar professional company to design, plan and perform a re-design of the ground floor.
Lake District National Park
Keswick Information Centre Redesign
None
·         Due to a change in use of the building (which will now be shared with the landlord) – LDNPA need to move to trading on one floor only.
·         A decision has been made that the Information Centre will only trade on the ground floor.
·         LDNPA require a professional shop-fitter or similar professional company to design, plan and perform a re-design of the ground floor.
·         The ground floor will also need to be re-designed to move the provision of information into the main area of the ground floor.
·         All services currently located on the first floor will need to be moved to the ground floor.
·         A hot-desking area will need to be built and located on the first floor for use of the LDNPA staff only
·         Retail floor-space is of a premium on the ground floor, so particular care will be required to ensure that it is DDA compliant.
·         Work to be completed during December ’12 or January ’13 – dependent on which is more feasible.

Contact:
Miss Olivia Clarke
Email Address:
olivia.clarke@lakedistrict.gov.uk
Telephone:
01539 792698
Address:
Lake District National Park Authority
Murley Moss
Kendal
Cumbria
LA9 7RL
United Kingdom
Key Dates
18/10/2012
18/12/2012
30/08/2012 00:00
18/09/2012 00:00
Other Information
2 (months)
2 (months)
0