Maintenance Works to Dinting Footbridge -Glossop

Provide, construct and maintain until the defects date all necessary work, including temporary works, in connection with proposed maintenance works to Dinting Footbridge to include;

Removal of existing bridge deck and provision and installation of new deck;

Removal of existing corrugated steel parapet panels and provision and installation of new steel mesh panels;

Surface preparation of all steelwork including provision and erection of temporary scaffolding to enable full encapsulation of the footbridge.

The successful contractor will need to demonstrate previous experience of undertaking this type of work as a Principal Contractor.
Failure to demonstrate adequate experience will result in the tender not being considered.http://www.sourcederbyshire.co.uk/contracts/show/id/6305