Procurement of a Client Project Manager
The Procurement of a Client Project Manager for the Re-Development of the Octagon Theatre.
United Kingdom-Bolton: Construction consultancy services
2016/S 161-290979
Contract notice
Services
Directive 2014/24/EU
Section I: Contracting authority
I.1)Name and addresses
3rd Floor Bolton Town Hall, Victoria Square
Bolton
BL1 1 RU
United Kingdom
Contact person: Mr Irfan Oomer
E-mail: irfan.oomer@bolton.gov.uk
NUTS code: UKD32
Internet address(es):Main address: http://www.bolton.gov.uk/
Address of the buyer profile: http://www.bolton.gov.uk/
I.3)Communication
I.4)Type of the contracting authority
I.5)Main activity
Section II: Object
II.1.1)Title:
Q034 — The Procurement of a Client Project Manager for the Re-Development of the Octagon Theatre.
II.1.2)Main CPV code
II.1.3)Type of contract
II.1.4)Short description:
The Borough Council of Bolton (‘the Authority’) and The Octagon Theatre Bolton (‘the Theatre’) is prepared to receive tenders for The Procurement of Client Project Manager (‘CPM’) for the Re-Development of the Octagon Theatre which will be subject to the information, specification and tender package enclosed. The Authority and the Theatre will be collectively referenced as (‘the Client’)
The Theatre opened in 1967 and although there have been various extensions and refurbishments since then, the building is no longer fit for purpose. The purpose of the CPM role is to facilitate the progress of the re-development project and to act as the interface between the Client side and the Contractor side, ensuring that the Client’s needs are fully met in the Project’s design and delivery.
II.1.6)Information about lots
II.2.3)Place of performance
Metropolitan Borough of Bolton.
II.2.4)Description of the procurement:
The Borough Council of Bolton (‘the Authority’) and The Octagon Theatre Bolton (‘the Theatre’) is prepared to receive tenders for The Procurement of Client Project Manager (‘CPM’) for the Re-Development of the Octagon Theatre which will be subject to the information, specification and tender package enclosed. The Authority and the Theatre will be collectively referenced as (‘the Client’)
The Theatre opened in 1967 and although there have been various extensions and refurbishments since then, the building is no longer fit for purpose. The purpose of the CPM role is to facilitate the progress of the re-development project and to act as the interface between the Client side and the Contractor side, ensuring that the Client’s needs are fully met in the Project’s design and delivery.
II.2.5)Award criteria
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
II.2.10)Information about variants
II.2.11)Information about options
II.2.13)Information about European Union funds
Section III: Legal, economic, financial and technical information
III.1.2)Economic and financial standing
III.1.3)Technical and professional ability
Section IV: Procedure
IV.1.1)Type of procedure
IV.1.8)Information about the Government Procurement Agreement (GPA)
IV.2.2)Time limit for receipt of tenders or requests to participate
IV.2.4)Languages in which tenders or requests to participate may be submitted:
IV.2.6)Minimum time frame during which the tenderer must maintain the tender
IV.2.7)Conditions for opening of tenders
Section VI: Complementary information
VI.1)Information about recurrence
VI.4.1)Review body
Victoria Square
Bolton
BL1 1RU
United Kingdom
VI.4.2)Body responsible for mediation procedures
Victoria Square
Bolton
BL1 1RU
United Kingdom
VI.4.3)Review procedure
The Authority reserves the right not to award any Contract as a result of the procurement process initiated by this notice and will not be liable for any costs incurred by candidates. Interested parties must log on The Chest
by way of expression of interest. The Authority is using the e-business portal known as The Chest. Applicants will need to register their details at the following link: https://www.the-chest.org.uk. Once registered, Applicants will be emailed a username and password which will allow applicants to gain access to the Invitation to Tender. Applicants will need to electronically submit the completed questionnaire and accompanying documentation via the on-line portal by 16:00 on Monday 19.9.2016. The contract period will be for 36 months with the option to extend for a further 6 months.
This is a contract notice. The standstill period of ten calendar days will be observed by the Authority and provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. Aggrieved parties who have been harmed or are at risk of harm by any breach of the Councils obligations may take action in the High Court (England, Wales and Northern Ireland).
VI.4.4)Service from which information about the review procedure may be obtained
Victoria Square, Bolton Town Hall
Bolton
BL1 1RU
United Kingdom
VI.5)Date of dispatch of this notice:
Related Posts
Principal Contractor for AIEC Project Aberystwyth
Architectural Main Contractor London
Civil and Structural Engineering Services Bath