The Installation of Boiler Optimisation Controls to achieve Guaranteed Savings

The Installation of Boiler Optimisation Controls to achieve Guaranteed Savings

This contract is primarily for the installation of boiler optimisation controls to nine boilers at 8 ASP properties and the achievement of guaranteed reductions in kWh of gas consumption over a five year period.
Avon and Somerset Constabulary
The Installation of Boiler Optimisation Controls to achieve Guaranteed Savings
None
This contract is primarily for the installation of boiler optimisation controls to nine boilers at 8 ASP properties and the achievement of guaranteed reductions in kWh of gas consumption over a five year period. The controls must be installed and accepted by the Authority before the beginning of March 2013. The contract period will end five years after the acceptance date. The contract will provide  for the limited future installation of boiler optimisation controls at other properties should this be required by the Authority. During the contract period the contractor will provide various support services required to ensure the achievement of the guaranteed reductions in kWh gas consumption. 
Contact:
Mr David Carpenter
Email Address:
d.carpenter@tauntondeane.gov.uk
Telephone:
01823 358184
Address:
Police Headquarters
PO Box 37 Valley road
Portishead
Bristol
BS20 8QJ
United Kingdom
Key Dates
07/12/2012
28/02/2017
10/10/2012 11:00
08/11/2012 12:00
Other Information
60 (months)
0 (months)
0